Air Force Airport Runway Mass Excavation (MES Project)
Massive 8,00,000 cu. m soil excavation and runway subgrade levelling for the Indian Air Force airfield at Phalodi, completed ahead of schedule with 2,00,000 cu. m achieved in the first 3 months.
8,00,000 Cu.M
Excavation Volume
2 Lakh Cu.M in 3 Mos
Early Milestone